This is a scatter shield that came off a drag car challenger in the 1970s 426 hemi this shield was blue printed for straitness and trued up in good condition
Other Parts for Sale
New mopar 1963-65 plymouth back-up lamp lenses pair(US $59.99)
New mopar 1963 plymouth parking lamp lens(US $59.99)
New mopar 1964 plymouth parking lamp lenses(US $69.99)
1955-1959 chevy truck wiring harness kit american autowire classic update 500481(US $466.65)
New mopar 1966-67 charger back-up lamp lens(US $24.99)
New mopar 1961 license light lens(US $29.99)
Lamborghini Urus SUV – made in SLOVAKIA
Fri, 25 Apr 2014The Lamborghini Urus SUV to be made in SLOVAKIA It could be argued that the appeal of Lamborghini stems from its ‘Italian-ness’, but it seems ‘Made in Italy’ is not an honour Lamborghini are going to bestow on their new Urus SUV. Instead, the plan is to build the Urus alongside other VW Group SUVs at VW’s plant in Bratislava, Slovakia. Autonews is reporting that VW are planning to build the Urus alongside the Porsche Cayenne, Audi Q7, VW Touareg and the bodies for the new Bentley SUV (they were planning to build the Bentley SUV in full in Bratislava too, but now it will be just the body to make sure the Bentley SUV is ‘British’).
Volkswagen Touran (2006): first official pictures
Wed, 13 Sep 2006By Dimitri Pesin First Official Pictures 13 September 2006 00:01 The lowdown Volkswagen has given its Touran MPV a welcome facelift, and a sprinkling of new features. The headline news is the introduction of Twincharge engines which employ both a turbo and a supercharger, as well as a park assist function that enables the seven-seater to slip itself into a space within 15 seconds. The revised model hits UK showrooms in early 2007.
Ram introduces CNG-powered pickup
Tue, 06 Mar 2012Aside from the Honda Civic Natural Gas, compressed-natural-gas-powered vehicles have usually been converted after the fact, generally for fleet use. Chrysler is hoping to carve out a niche in the corporate-pickup segment by selling a factory-built CNG Ram 2500 that can seamlessly switch over to gasoline operation when the natural-gas tanks run dry. The twin 4.6-cubic-foot CNG tanks (which store the equivalent of 18.2 gallons of gas) take up a section of the bed, while an eight-gallon gasoline tank provides fuel during start-up and then reserve capacity when the compressed tanks are tapped out, allowing the bruiser a measure of operational flexibility.