Standard Motor Products Us376 Ignition Switch on 2040-parts.com
Temecula, California, US
Other for Sale
Standard motor products us287 ignition switch(US $65.14)
Standard motor products us219l ignition lock cylinder(US $195.94)
Standard motor products us683 ignition switch and lock cylinder(US $138.83)
Standard motor products us89 ignition switch(US $27.95)
Standard motor products us307l ignition lock cylinder(US $48.65)
Standard motor products us267 ignition switch(US $71.22)
Renault Koleos
Thu, 28 Sep 2006By Ben Barry Motor Shows 28 September 2006 01:37 The lowdown Renault boss Carlos Ghosn today unveiled the latest fruits of the Renault/Nissan alliance at the Paris Motor Show: the Renault Koleos concept, the French firm’s first steps into soft-roader territory. Despite being a concept, the Koleos closely mirrors the production car. The Koleos is an incredibly important vehicle for Renault, taking it into the crossover 4x4 market, and being a key player in La Regie’s bid to release 26 cars by 2009 – ‘to rejuvenate, extend and revitalize our product range,’ according to Ghosn.
Volvo P1800 turns 50
Sun, 05 Jun 2011Volvo's sporty little number - the P1800 For those of us old enough to think in black and white, the Volvo P1800 conjures up long-forgotten images of The Saint and Roger Moore. For those too young to remember, the Saint was Roger Moore’s television audition for James Bond, but the real star of the show was the Volvo P1800. Even in the early 1960s, Volvo was renowned for its solid, safe and respectable cars.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.


