Iron Rock Off Road - Zj 5.5" Critical Path Long Arm Kit 93-98 on 2040-parts.com
Shakopee, Minnesota, US
Lift Kits & Parts for Sale
- Iron rock off road - new 3" suspension lift kit xj jeep cherokee 84-01(US $339.99)
- Iron rock off road - 4"suspension lift kit ,jk jeep wrangler (07-10) 2/4door(US $499.95)
- Iron rock off road - 7" premium lift kit zj jeep grand cherokee 93-98(US $2,499.99)
- Iron rock off road - zj 7" critical path long arm kit 93-98(US $1,499.99)
- Iron rock off road - 6" suspension lift kit for tj jeep wrangler (1997-2006)(US $1,049.95)
- Iron rock off road - stainless steel braided brake line kit for xj (84-01)(US $99.99)
Audi A1 & A3 get 1.4 TSI with Cylinder on Demand
Mon, 11 Mar 2013Audi is introducing cylinder on demand technology to the A1 and A3 with the launch of the 1.4 TSI CoD option in the UK. Price from £16,740. Cylinder deactivation – or cylinder on demand – is a technology that’s been around on big engines for some time.
Volkswagen Golf GTE Plug-in Hybrid UK debut
Wed, 02 Apr 2014The VW Golf GTE (pictured) gets its UK debut at the NEX next week The Volkswagen Golf GTE – which VW see as a plug-in hybrid Golf GTI – was revealed in February ahead of its debut at the Geneva Motor Show last month and is now heading for the Gadget Show Live at the NEC next week for its UK debut. With a 1.4 litre TSI petrol turbo producing 148bhp and a 101 bhp electric motor, the Golf GTE promises decent performance – 0-62mph in 7.6 seconds – daft official economy figures of 188 mpg and the ability to run on electric power only for up to 31 miles. It’s an appealing combination for a Golf that can offer city running benefits with a turn of decent performance when the mood takes, although at a price likely to be north of £30k it’s not exactly a budget buy.
Changan CV11
Wed, 28 Mar 2007Changan's first MPV rolled off the production line on March 26 in China, following its preview as a concept four years ago at the Shanghai Motor Show. Since then the MPV market in China has boomed, sales in 2006 a third higher than in 2005. The package and styling of the CV11 are both euro-generic, but is interesting to see a different market embrace them so enthusiastically.