Find or Sell any Parts for Your Vehicle in USA

18" Mkw Offroad M81 Chrome Rims & Cooper Lt285-65-18 Discoverer At3 Tires Wheels on 2040-parts.com

US $1,954.00
Location:

Addison, Illinois, US

Addison, Illinois, US
Returns Accepted:Returns Accepted Item must be returned within:30 Days Refund will be given as:Money Back Return shipping will be paid by:Buyer Return policy details:PLEASE SEE ITEM DESCRIPTION. Restocking Fee:No Rim Material:Alloy Rim Width:9 Number of Bolts:5 OR 8 Bolt Pattern:Array Rim Brand:MKW Rim Manufacturer Part Number:M81 Rim Structure:One Piece Section Width:285 Aspect Ratio:65 Rim Diameter:18" Load Index:125 Speed Index:S Tire Brand:Cooper Car Type:Truck/SUV Overall Diameter:32.5" Tire Type:4x4 / Truck

Wheel + Tire Packages for Sale

Geneva Show 2014: Renegade Is Anything But Rough And Ready

Wed, 05 Mar 2014

DON’T be put off by the size of Jeep’s latest offering, as its new Renegade might be small but it’s claimed to be just as capable as its larger stablemates. With Jeep now part of the Fiat family, it’s no surprise to learn that the Renegade is based on the Italian firm’s 500L. The diminutive Renegade is, however, expected to remain true to the Jeep brand thanks to off-road versions complete with all-wheel drive, skid plates and raised ride height.

New Porsche 911 Turbo gets a bigger engine and cranks out 500 hp

Fri, 07 Aug 2009

There are plenty of good reasons to go to the Frankfurt motor show in September, but this seals the deal--Porsche will use the show for the rollout of the new 911 Turbo in coupe and convertible versions. Porsche on Friday gave us photos and details on the newest 911. Here are the high points: -- New 3.8-liter flat-six engine rated at 500 hp.

Workers misspell 'bus' on road markings

Tue, 26 Aug 2014

WORKMEN have given road users something to chuckle about by misspelling the word 'bus' during roadworks. "Bup stop" was painted on to the road surface in Bristol in large yellow lettering at the end of last week, with the stencilled letter P used instead of S. The mistake was made as part of road repairs which are likely to last up to four weeks in the Old Market area of the city centre.