Find or Sell any Parts for Your Vehicle in USA

1970 Dodge Challenger Vinyl Top Drip Rail End Molding on 2040-parts.com

US $18.00
Location:

Ludlow, Massachusetts, US

Ludlow, Massachusetts, US
Item must be returned within:14 Days Refund will be given as:Money Back Return shipping will be paid by:Buyer Restocking Fee:No Returns Accepted:Returns Accepted Return policy details:

 '70 CHALLENGER VINYL TOP DRIP RAIL END MOLDING. THE CHROME IS IN NICE SHAPE WITH LITE SCRATCHES.  IT DOES HAVE A SMALL DENT [PICTURE 3]. I ONLY HAVE THE ONE SIDE.

PAYMENT BY PAYPAL ONLY AND DUE WITHIN 3 DAYS OF AUCTION ENDING

I SHIP THE NEXT BUSINESS DAY AFTER PAYMENT CLEARS TO THE LOWER 48 STATES ONLY

ASK QUESTIONS BEFORE BIDDING

CHECK OUT MY OTHER LISTINGS FOR MORE PARTS

THANKS FOR LOOKING AND GOOD LUCK BIDDING

Mouldings & Trim for Sale

Nissan pits GT-R vs. Leaf Nismo RC vs. Altima V8 Supercar

Wed, 12 Mar 2014

Nissan had a little fun at the Clipsal 500 in Adelaide, Australia earlier this month. For an exhibition, it pitted its Leaf Nismo RC versus its Nissan GT-R road car and the Nissan Altima V8 Supercar. Thankfully, the whole contest was recorded for posterity.

Audi S3 Sportback (2013) prices revealed

Tue, 27 Aug 2013

Audi has revealed prices for the new S3 Sportback ahead of its arrival in September. The BMW M135i and Mercedes A45 AMG rival starts at £31,260 for the six-speed manual, but you’ll want to pay an extra £1480 and get the six-speed twin-clutch S-tronic 'box that helps the five-door version of Audi’s 296bhp Quattro hot hatch see off 0 to 62mph in 4.9sec. How does it compare to its closest rivals?

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.