2004 Acura Rsx Torque Convertor - Used on 2040-parts.com
Morris Plains, New Jersey, US
Used Torque Converter for a 2004 Acura RSX Base Model 2 door coupe. I purchased this used for my sons car but we never installed it. Being sold as is never installed or tested by me but was told it is okay from the previous seller. Here are the details we received when we purchased it last year. Donor Car: 2004 Acura RSX base model 2 Door Coupe Miles - 63,948 2.0 L Engine K20A3 Automatic Transmission
Torque Converters for Sale
10" tci torque convertor(US $200.00)
Ford torque converter - c4 high stall 2200-2500 (US $195.00)
4l60 4l60e 4l65 4l65e 98 up 300mm gm chevy torque converter(US $129.99)
Bd diesel 1030227 performance torque converter(US $951.89)
Arp converter bolts(US $5.00)
Bd diesel 1030229 performance torque converter e-350 super duty e-450 super duty(US $984.79)
Motoring April Fool’s 2009: the best and worst
Wed, 01 Apr 2009By Tim Pollard Motoring Issues 01 April 2009 00:01 Those crazy car makers have been letting their hair down to present us with an array of April Fool’s Day fodder. We’ve handily collated all the gags and jokes that’ve landed in our intray today – and you can name and shame the best and worst in our CAR Magazine poll below. So read and weep – and then vote!
BMW to show production hybrid X6, 7-series at Frankfurt motor show
Thu, 13 Aug 2009A pair of fire-breathing hybrids from BMW based on the X6 and the 7-series will be revealed in production guise at the Frankfurt motor show in September. The ActiveHybrid X6 arrives in the United States late this year, followed by the ActiveHybrid 7 in the spring of 2010. Both hybrids combine electric motors with powerful twin-turbo V8 engines to boost output, performance and fuel economy, while retaining the looks of the popular conventional versions.
Home of NAIAS to be updated
Thu, 31 Mar 2011The spiritual home of the NAIAS is set to be rejuvenated. The Cobo center in Detroit, home of the North American International Auto Show for over 24 years, is part of a $221 million project that will see it extended and renovated extensively. The Detroit Regional Convention Facility Authority have announced that many of the improvements to the Cobo center will be ready for the 2012 NAIAS, although the project is unlikely to be finished until 2014.

