Smart Tow Trailer Sealed 4" Rectangular Amber Sidemarker Light 2403 on 2040-parts.com
Pinckney, Michigan, United States
NEW SEALED IN PACKAGE
|
Towing Systems for Sale
- Smart tow trailer sealed 4" oblong amber turn light 1460(US $5.99)
- Smart tow trailer sealed 4" oblong red clearance light 1469(US $5.99)
- 1995-98 ford 7.3l w/ac - 12 gl clutch pump 700424(US $1,979.25)
- 1995-98 ford 7.3l w/ac - 17 gl clutch pump 700424(US $2,073.75)
- 1999+ chev 6.0l gas inline 0.8 gl clutch pump 700384(US $1,501.50)
- 1999+, chevrolet 6.0l, gas, a, hp - 9 gl clutch pump 700526(US $2,142.00)
Mini Convertible (2009): the new R57 cabrio
Fri, 28 Nov 2008By Simon Stiel First Official Pictures 28 November 2008 10:46 Mini has just issued the first photos of the new R57 Mini Convertible, which rolls into dealerships in March 2009 and follows the lead set by the latest hatchback. So it's cleaner, a little bit more polished inside and out, and there will probably be evidence of some middle-aged spread when we drive it in 2009.So what's new on the R57 Mini Convertible?All the changes are in line with the Mini hatch, so you get the latest PSA-shared 1.6 petrol engines, BMW group Efficient Dynamics – now redubbed Minimalism in Minispeak – stop-start and intelligent alternator control, helping to contribute to a 22% jump in fuel efficiency, Mini claims. The 1.6 Cooper pumps out 137g/km of CO2.
Hungarian Grand Prix (2012) RESULT
Sun, 29 Jul 2012With a dominant Lewis Hamilton on pole and Button just behind in his McLaren, will the 2012 Hungarian Grand Prix see McLaren dominate? There’s no question, certainly on the evidence of free practice and qualifying at the Hungaroring for the 2012 Hungarian Grand Prix, that McLaren has found the speed it’s lost recently. Hamilton was streets ahead of the rest and Button close behind as McLaren showed they probably have the fastest car on the grid this weekend.
Jaguar Land Rover to build new £400m Engine Plant in Wolverhampton
Sun, 18 Sep 2011New JLR Engine Plant to be built in Wolverhampton Update 19th September: Jaguar has now confirmed our story, although the cost is expected to be £335 million and the number of new jobs 750. We’d guess the 2,00 jobs we quoted in the original story includes jobs created in the supply chain. Work is expected to start on the new engine plant in early 2012.