04 05 06 07 08 09 10 11 12 Mazda 3 Lower Control Arm Rear Lateral Link 21782 on 2040-parts.com
San Antonio, Texas, United States
Used but functional unless otherwise stated in description
|
Control Arms & Parts for Sale
- 05-10 honda* odyssey r. lower control arm re trailing arms 21619 oem* 21619(US $71.50)
- Suspension control arm & ball joint assembly fits 1996-2000 isuzu hombre moog(US $106.91)
- New suspension control arm front right lower mas ca61044(US $52.99)
- New mevotech control arm and ball joint assembly ms251043(US $65.99)
- 2pc front lower control arm bushings 2006 2007 2008 2009 2010 2011 honda civic(US $35.50)
- Eight piece front suspension package for a chrysler w/lifetime warranty(US $93.14)
Anniversary-edition Shelby Cobra sells out within 48 hours of its debut
Tue, 01 Feb 2011All 50 copies of the 50th Anniversary Shelby Cobra Street Car sold out within 48 hours of its official introduction, Shelby American said on Monday. The car was unveiled during the Barrett-Jackson Auction on Jan. 21 in Scottsdale, Ariz.
Strand-Craft 122: It's a boat and a car
Thu, 02 Sep 2010Feel like boating this holiday weekend? Here's what every AutoWeek reader needs: Mega-yacht builder Strand-Craft has introduced its extravagant 122, which the company calls a "high-performance streamlined Open super yacht." The art deco interior can be designed to suit your individual needs and includes a four double staterooms, heads, reception and salon areas. There are 52-inch LED televisions and Bang & Olufsen sound systems in all rooms.
Seat completes industry's largest solar panel installation
Mon, 25 Nov 2013SEAT HAS completed construction of the largest solar panel installation in the automotive industry. The huge 'Seat al Sol' array at the firm’s Martorell plant outside Barcelona is the size of 40 football pitches and generates 15 million kilowatt hours of power per year courtesy of the reliable Spanish sunshine. The electricity produced is enough to account for a quarter of the amount needed to build a year’s allocation of Leons, reducing the factory’s energy bills significantly and saving 7,000 tonnes of CO2 per year.